{"id":1412,"date":"2025-04-15T05:58:17","date_gmt":"2025-04-15T05:58:17","guid":{"rendered":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/?page_id=1412"},"modified":"2026-03-18T18:59:13","modified_gmt":"2026-03-19T02:59:13","slug":"tim-hortons-dawson-creek-subdivision","status":"publish","type":"page","link":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/events\/operating-sessions\/tim-hortons-dawson-creek-subdivision\/","title":{"rendered":"Tim Horton\u2019s Dawson Creek Subdivision"},"content":{"rendered":"\n<p>This layout depicts the British Columbia Railway\u2019s Dawson Creek Subdivision and a portion of the Fort St. John Subdivision as they appeared and operated in 1977.&nbsp; The layout was dismantled and moved in 2021, and after a two year campaign to reassemble it in a new location, it is back in operation.&nbsp; The new version includes an expanded industrial area in Chetwynd and an extended Fort St. John Subdivision with eleven feet of new benchwork.&nbsp; Further expansions are planned.&nbsp; Operators can choose to work Chetwynd Yard or run the Dawson Creek Switcher, the Septimus Turn or perhaps a work train.&nbsp; Operations are patterned closely on prototype practices at the time.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Prototype<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:2%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:30%\">\n<p style=\"line-height:1.4\"><strong>\u2022<\/strong> Style:<br><strong>\u2022<\/strong> Prototype:<br><strong>\u2022<\/strong> Location:<br><strong>\u2022<\/strong> Era:<br><strong>\u2022<\/strong> Interchange:<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:78%\">\n<p style=\"line-height:1.4\">Prototypical<br>British Columbia Railway<br>Northeastern British Columbia<br>1977<br>Northern Alberta Railways<\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">The Layout<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:2%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:30%\">\n<p style=\"line-height:1.4\"><strong>\u2022<\/strong> Location:<br><strong>\u2022<\/strong> Scale:<br><strong>\u2022<\/strong> Size:<br><strong>\u2022<\/strong> Control:<br><strong>\u2022<\/strong> Accessibility:<br><strong>\u2022<\/strong> Mainline Length:<br><strong>\u2022<\/strong> Yards:<br><strong>\u2022<\/strong> Passing Sidings:<br><strong>\u2022<\/strong> Scenery Complete:<br><strong>\u2022<\/strong> Carspots:<br><strong>\u2022<\/strong> Motive Power:<br><strong>\u2022<\/strong> Rolling Stock:<br><strong>\u2022<\/strong> Track Construction:<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:78%\">\n<p style=\"line-height:1.4\">North Vancouver<br>N<br>10\u2032 x 15\u2032 + 11\u2032 x 6\u2033<br>Lenz DCC<br>Elevator to 12th floor<br>~ 70 feet<br>Chetwynd, Dawson Creek<br>4<br>None<br>~ 24<br>MLW RS-3, RS-10, RS-18, C-420, C-425, M-630<br>Mix of RTR, kit-built, kit-bashed, scratch-built<br>Atlas Code 55 (Peco Code 55 in helix)<\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Operations<\/h2>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:2%\"><\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:30%\">\n<p style=\"line-height:1.4\"><strong>\u2022<\/strong> Clock Speed:<br><strong>\u2022<\/strong> Session Length:<br><strong>\u2022<\/strong> Crew Size:<br><strong>\u2022<\/strong> Dispatching:<br><strong>\u2022<\/strong> Car Forwarding:<br><strong>\u2022<\/strong> Communication:<br><strong>\u2022<\/strong> Jobs:<br><br><strong>\u2022<\/strong> Train Lengths:<br><strong>\u2022<\/strong> Session Style<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:78%\">\n<p style=\"line-height:1.4\">6:1<br>3 1\/4 hours<br>3 &#8211; 4<br>Manual Block System<br>Switch lists<br>Voice<br>Dispatcher, Chetwynd Yard, Septimus Turn, Dawson Switcher, Work Trains<br>10 to 15 cars<br>Relaxed (low traffic)<\/p>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">More Information<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Website:&nbsp;&nbsp;<a href=\"http:\/\/www.bcrdawsonsub.ca\/\" target=\"_blank\" rel=\"noreferrer noopener\">www.bcrdawsonsub.ca<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.youtube.com\/channel\/UC3MbxkZkx7zApSYCHqu2IYQ\">YouTube channel&nbsp;<\/a><\/li>\n\n\n\n<li>Model Railroad Planning 2009<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-2 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Main-Layout-Room.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"681\" data-id=\"871\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Main-Layout-Room.jpg\" alt=\"\" class=\"wp-image-871\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Main-Layout-Room.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Main-Layout-Room-300x204.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Main-Layout-Room-768x523.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Septimus-Adajcent-Room.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"683\" data-id=\"866\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Septimus-Adajcent-Room.jpg\" alt=\"\" class=\"wp-image-866\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Septimus-Adajcent-Room.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Septimus-Adajcent-Room-300x205.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/2023-05-24-Septimus-Adajcent-Room-768x525.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/02-Septimus.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"683\" data-id=\"870\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/02-Septimus.jpg\" alt=\"\" class=\"wp-image-870\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/02-Septimus.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/02-Septimus-300x205.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/02-Septimus-768x525.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/01-Chetwynd-Yard.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"667\" data-id=\"869\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/01-Chetwynd-Yard.jpg\" alt=\"\" class=\"wp-image-869\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/01-Chetwynd-Yard.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/01-Chetwynd-Yard-300x200.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/01-Chetwynd-Yard-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/04-Dawson-Creek.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"667\" data-id=\"868\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/04-Dawson-Creek.jpg\" alt=\"\" class=\"wp-image-868\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/04-Dawson-Creek.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/04-Dawson-Creek-300x200.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/04-Dawson-Creek-768x512.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/05-Chetwynd-Yard.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"619\" data-id=\"867\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/05-Chetwynd-Yard.jpg\" alt=\"\" class=\"wp-image-867\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/05-Chetwynd-Yard.jpg 1000w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/05-Chetwynd-Yard-300x186.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/05-Chetwynd-Yard-768x475.jpg 768w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/03-Pine-River.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"534\" data-id=\"865\" src=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/03-Pine-River.jpg\" alt=\"\" class=\"wp-image-865\" srcset=\"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/03-Pine-River.jpg 800w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/03-Pine-River-300x200.jpg 300w, https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-content\/uploads\/2023\/06\/03-Pine-River-768x513.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>This layout depicts the British Columbia Railway\u2019s Dawson Creek Subdivision and a portion of the Fort St. John Subdivision as they appeared and operated in [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":870,"parent":64,"menu_order":9,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1412","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/pages\/1412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/comments?post=1412"}],"version-history":[{"count":3,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/pages\/1412\/revisions"}],"predecessor-version":[{"id":2257,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/pages\/1412\/revisions\/2257"}],"up":[{"embeddable":true,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/pages\/64"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/media\/870"}],"wp:attachment":[{"href":"https:\/\/railwaymodellersmeetofbc.ca\/wp\/wp-json\/wp\/v2\/media?parent=1412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}